top button
Flag Notify
    Connect to us
      Site Registration

Site Registration

When the Lyttelton Railway Tunnel was completed in New Zealand in 1867 it was what?

+1 vote
151 views
When the Lyttelton Railway Tunnel was completed in New Zealand in 1867 it was what?
posted Dec 2, 2020 by Swati Arora

Share this question
Facebook Share Button Twitter Share Button LinkedIn Share Button

1 Answer

0 votes

The first tunnel to be built through the side of an extinct volcano
The tunnel is 2.6 km long, the longest in New Zealand at the time but not in the world.

answer Dec 3, 2020 by Rahul Vaidya
...