How long will it take Mark to complete this task, at minimum?

0 votes
177 views
posted Dec 7, 2021 by Anuradha Tabyal

Looking for solution? Promote on:
Facebook Share Button Twitter Share Button LinkedIn Share Button




Similar Puzzles
0 votes

Rohit and Virat, working together, can complete an assigned task in 20 days.
If Rohit worked alone and completes half the task and then Virat takes over and completes the remaining half, then the task gets completed in 45 days.
How long will Rohit take to complete the task is he worked alone?
Assume that Rohit is more efficient then Virat.

0 votes

A man is allocated a task. He doubles the task done everyday. If the man completely does the task in 18 days, how many days did it take for the man to complete 25% of the task?

0 votes

There is a huge water tank and there are four pipes that can fill the water tank.

The first pipe can fill the water tank completely in exact 2 days.
The first pipe can fill the water tank completely in exact 3 days.
The first pipe can fill the water tank completely in exact 4 days.
The first pipe can fill the water tank completely in exact 6 hours

Let's say we opened all the pipes simultaneously, how long will it take the water tank to be filled completely?

+1 vote

You want to fill a bathtub by running water from both the hot and cold taps. The hot tap takes 6 minutes to fill the tub alone and the cold tap takes 4 minutes to fill alone. So you turn them both on at the same time but you are unaware that you left the plug out. The plug empties the tub in 12 minutes.

How long will it take to fill the tub?

+2 votes

Mukesh and Chandan can complete a task in 30 days when working together. After Mukesh and Chandan have been working together for 11 days, Chandan is called away and Mukesh, all by himself completes the task in the next 28 days.

Had Mukesh been working alone, How many number of days taken by him to complete the task.

...