In this year 2015, Holi will be enjoyed at 6th March 9 AM and Deepawali will be celebrated at 11th November 8 PM.
What will be the total time interval (in hours) between the two ?
6011 hrs
total 250 days = 6000hrs (24*25) +11 hrs (9am to 8pm)
A tap can fill a tank in 30 minutes, another tap can fill it in 1.5 hours. If both the taps are opened at 11.40 am. At what time will the tank be filled?
A car starts from rest and accelerates uniform upto speed 90 km/hrs in 5 sec. What will be the total distance covered by car in this time ?
A construction company employs 60 men to build a bridge of 500 m in 30 days working 8 hours a day. If in 24 days they completed 3/5 part of work, then how many more employees should be hired to finish the work in time, working 10 hours a day?
30 men can load 60 bags of cement in a truck in 5 hours. If 5 men leave the job, how many cement bags will be loaded in 10 hours?
If 5 engines consume 6 metric tonnes of coal when each is running 9 hours a day, how much coal (in metric tonnes) will be needed for 8 engines, each running 10 hours a day?