Probably is very generic question but while designing the power control mechanism what are the basic roles to be kept in mind other then power saving.
The Network Signaling NS_X value may be sent by E-Node B anytime? In a handover procedure, the eNodeB may request that the UE change its RF specifications for a new condition (A-MPR)? If yes, what message would be sent to convey this information?
During SPS , there wont be any DCI so how to control the UL power?