top button
Flag Notify
    Connect to us
      Site Registration

Site Registration

Diameter Credit-Control message (Gy): Final Unit Indication and Result Code

+3 votes
2,346 views

I'm doing some integration toward Gy client (PCEF), and encountered an unclear area. I'm not sure if it is unclear in RFC 4006 or the 3GPP TS32.299 or both.

Scenario: A user logs on. The user has no credit left for a rating-group 42.

CCR-initial and CCA-initial:
Nothing interesting. In Gy it is typically just "empty" requests for the purpose of registering the user session.

The user then attempts to use rating-group 32:

CCR-update:

 Multiple-Services-Credit-Control {
 Rating-Group = 42
 Requested-Service-Unit {
 }
 }

to which the OCS (Gy server) would normally respond:

CCA-update:

 Result-Code = 2001 (success)
 Multiple-Services-Credit-Control {
 Rating-Group = 42
 Result-Code = 4012 (credit-limit-reached)
 Final-Unit-Indication {
 ...
 }
 }

However, the Gy specification says that a zero-grant is needed, which to me sounds a bit odd, but nevertheless:

Result-Code = 2001 (success)
 Multiple-Services-Credit-Control {
 Rating-Group = 42
 Result-Code = 4012 (credit-limit-reached)
 Granted-Service-Unit {
 CC-Total-Octets = 0
 }
 Final-Unit-Indication {
 ...
 }
 }

Now, the Gy client vendor says that the result-code inside the MSCC must be 2001 (success). It sort of makes sense because there is a grant.

But that made me wonder: In which case would result-code=4012 make sense? Is it just 3GPP who has "mangled" diameter-credit-control in the Gy application?

posted Oct 7, 2013 by Bob Wise

Looking for an answer?  Promote on:
Facebook Share Button Twitter Share Button LinkedIn Share Button

Similar Questions
+3 votes

I had a doubt on the multiple service credit control AVP for charging. I have seen some pcap traces where RSU, USU, GSU AVPs are sending within MSCC, and out of MSCC avps.

Does MSCC block is mandatory for Online Charging System, can you please the reason also?

+4 votes

I am not able to understand the significance of "limited success" in a answer message and also want to know what a diameter node does when it receives this limited success within a answer message ?

+4 votes

Hi,

What are the possible Result-Codes for Multiple-Services-Credit-Control AVP.
Is there any other result codes from 2001, 4012? If so, please mention the scenario
Any reference would be highly appreciable

+5 votes

State the difference between Diameter Credit Control Applications and Ro applications with reference to Diameter protocol?

...