One cubic meter brick masonry, number of brick required

0 votes
338 views
A500
B450
C550
D400

Correct Option: 2  
posted Dec 25, 2019 by Ajay Sharma

Looking for an answer?  Promote on:
Facebook Share Button Twitter Share Button LinkedIn Share Button

Similar Questions
+5 votes

Given 2 strings s1, s2 and s1 is equal to s2 if they are lexicographically sorted, Find minimum number of swaps required to transform s1 to s2?

Swap Definition:
Problem 1 : we can transform index i with i+1 where 0<=i< s1.length()-1
Problem 2 : we can transform index i with i+1 where 0<=i< s1.length()-1 and other operation we can swap first character of string with last

example: s1="abc", s2="cba"
In problem1 3 swaps required abc ---> bac ---> bca ---> cba
In problem2 1 swaps required abc ---> cba [swap first and last element]

+1 vote

Is there any limit, do we have any practical number from any professional MME provider.

+1 vote

In LTE/Volte Network one HSS can be share in both or required individual HSS?

+1 vote

We know, in lte, an eNodeB can connect to multiple MMEs. Can someone please explain in details ?
Apart from load balancing, is there any other reason ?

...