40 men can build a wall 20m high in 15 days. How many men required to build a similar wall 50 m high in 3 days?

+1 vote
2,849 views
40 men can build a wall 20m high in 15 days. How many men required to build a similar wall 50 m high in 3 days?
posted Oct 6, 2016 by anonymous

Share this puzzle
Facebook Share Button Twitter Share Button LinkedIn Share Button

5 Answers

+1 vote
 
Best answer

40 men can build 20m high wall in 15 days
=> 1 men can build 20m high wall in 15*40 days
=> 1 men can build 1m high wall in 15*40/20 i.e. 30 days
=> 30 days 1m high wall requires 1 men
=> 30 days 50m high wall requires 1*50 men
=> 3 days 50m high wall required 1*50*10 men

Answer:
500 Men required

answer Oct 7, 2016 by Salil Agrawal
exactly correct answer 500men require to build 50 m hight wall in 3 days
+1 vote

500 men is the correct answer.

The answer can be arrived at by increasing the number of men according to the following ratios:
40 men*(50m/20m)*(15days/3days) = 40men*2.5*5 = 500men

answer Oct 8, 2016 by George Davros
0 votes

20 men is the answer:

First convert into meters per day/man: 20*15 = 300 meters per day/40 men = 7.5 meters per day/man
Then answer the question by using the new parameters: (50 meters)(3 days) = 150 meters per day/7.5 meters per day/man = meters per day canceling out leaving: 20 men are the new requirement.

Correction:

500 men is the correct answer.

The answer can be arrived at by increasing the number of men according to the following ratios:
40 men*(50m/20m)*(15days/3days) = 40men*2.5*5 = 500men

BTW: a thank you to those that provided the correct answer. Learning from mistakes allows a person to try different solutions.
And by being provided with the correct answer you can work the problem backwards, similar to reverse engineering.

answer Oct 6, 2016 by George Davros
0 votes

500 members required

answer Oct 7, 2016 by Jaganathan
0 votes

1.- 40 men build a wall 20 mts high in 15 days
2.- 40 men will build a wall 50 mts high in 15 x 50/20 ( 37,5 days)
3.- X men will build a wall 50 mts high in 37,5 / 12,5 ( 3 days)
Then the number of men will be : 40 x 12,5 = 500 men
The answer is 500 men

answer Oct 19, 2016 by anonymous



Similar Puzzles
0 votes

Six men do a piece of work in 10 days with an effort of 6 hours per day. How many extra men are required for doing the work of double strength in 4 days with an effort of 5 hours per day

+1 vote

Rahul forms a wall in 10 days and Sahil forms a wall in 15 days. Rahul and Sahil start the work of forming wall together but after 2 days Rahul leaves the work.
How many days are required for making the remaining wall by Sahil?

+1 vote

If 15 men take 21 days of 8 hours each to do a piece of work. How many days of 6 hours each would 21 women take, if 3 women do as much work as 2 men?

0 votes

10 men and 15 women complete half of the work in 12 days and 6 men and 15 women complete one third of the work in 10 days.
How many days are required to complete the same full work by taking 10 men and 30 women?

...